Service Desk 0300 300 2212

JANET Partner Agreement

JANET Partner Agreement

This is the proforma text of the JANET Partner Agreement (JPA Issue 1). Besides the main body of the agreement, it contains schedules which amongst other matters define:

  • service levels;
  • how JANET(UK) and the RNOs work together (the "JANET Delivery Team");
  • how the regional network is funded by JANET(UK) for day-to-day operation and upgrades;
  • how the RNO uses the JANET brand when delivering JANET services.

JANET Partner Agreement

JPA Operational Documents

The JPA references a number of "Operational Documents". These are reference documents relating to technical and other operational detail in the running of the regional network. At present these are:

RNO Reporting Guidelines

IP Routing Guidelines

Regional Network Entry Point Guidelines

JPA Operations Manual

The "Operations Manual" is a good-practice guide written for staff within regional networks. It is designed to assist them in ensuring that the regional network is operated to the standards specified in the JPA. It is not in itself a contractually binding document. It is maintained by the JANET Delivery Team.

Operations Manual

Development of the JPA

The JPA was developed by JANET(UK) and a team from the UK MAN Manager's Group (UKMMG).
The following is an archive of the main documents produced during the development process, and of presentations given by members of JANET(UK).

Archive of JPA documents and presentations